News

Click on Cowbridge Gem to view their latest edition

Please contact us when you have News to add to this page!!!

Redrow Homes to build 100 dwellings east of St Nicholas

posted 14 Mar 2015, 07:51 by Ian Perry   [ updated 14 Mar 2015, 08:07 ]

More details to follow...

Please join our Facebook group for the latest news.






Website Moving!

posted 6 Aug 2014, 07:30 by Ian Perry

The website is moving from the .org.uk domain/address, to the .UK domain.

The .UK domain is more suitable for this website, and cost significantly less...  This website is a private initiative, with the Community Council refusing to contribute.

Five Mile Lane upgrade advances

posted 26 Jun 2014, 04:13 by Ian Perry   [ updated 26 Jun 2014, 04:36 ]

Plans to trunk the A48 through St. Nicholas took another step towards completion today with the announcement that an environmental impact assessment on realigning the road is to be undertaken.


Five Mile Lane would be upgraded, through widening and straightening, as it was towards Sycamore cross in the 1980's, with evidence suggesting a new stretch of road through the woodlands north of Barry.

From the councils documents:

DESCRIPTION OF DEVELOPMENT 
 
The proposal is to make use of the existing and improved part of the highway and to align the more winding and rural section of the road. The alignment will begin 1.5km from Sycamore Cross and will again meet the existing road approximately 1km from the Weycock cross roundabout.  
 
The proposed alignment will include a combination of earthworks and ‘in cutting to widen and align the road over this distance. The road will be widened from 7.3m to 9.3m. The proposals may involve underpasses and overbridges to provide access to plots to the west of the site. The works will also include drainage works, which are likely to require attenuation of water on land adjacent to the new 
alignment.  

The document continues, stating in regards to St Nicholas and Bonvilston:  ...it is considered that the construction works, as well as the improvements and capacity of the road to take more traffic, are likely to have significant impacts on many of these communities by virtue of noise, disruption and ultimately the increase of traffic. 



Walesonline reports:

An investigation has been ordered into the possible environmental impact of improvement plans on a South Wales “danger road”.

The plans centre on the Five Mile Lane which connects Barry at the Weycock Cross roundabout with the Sycamore Cross junction on the A48.

The road is regarded as an essential part of the highway network leading to the St Athan-Cardiff Airport Enterprise Zone.

The road is also one of the most dangerous in the Vale of Glamorgan and various improvements and safety measures have already been carried out.

The proposed improvements by the Welsh Government, which will have to be approved by the Vale of Glamorgan council, stem from the proposals to trunk the route to Cardiff Airport via Culverhouse Cross, Sycamore Cross, Five Mile Lane and Cardiff Airport.

The assessment will have to be done as part of the application.

In his decision letter, Rob Thomas, the Vale council’s director of development services said: “Having regard to the key issues, the planning authority is of the view that the characteristics and location of the site are such that the potential impacts of the development are likely to be significant on the environment.

“Accordingly, it is considered that there is a requirement for a formal Environmental Impact Assessment to be submitted.”

The proposal includes using an upgraded road immediately off the A48 at Sycamore Cross and road alignment work which will require access to farms and other properties in the area, including the Barry Woodlands Site of Special Scientific Interest.

 




Community Council to go online?

posted 10 Jun 2014, 07:30 by Ian Perry   [ updated 10 Jun 2014, 07:32 ]

Town and community councils in Wales, are to be given a “statutory duty” to put far more information  on the internet than they do at the moment.
 
St Nicholas and Bonvilston Community currently have no online presence, having refused to make their minutes available to this website.

The Local Government (Democracy) Wales Act 2013 requires our Community Council to make available electronically 
    (a) information on how to contact it and, if different, its clerk including —
            (i) a telephone number; 
            (ii) a postal address; 
            (iii) an email address;
    (b) information about each of its members, including —
            (i) the member’s name; 
            (ii) how the member may be contacted; 
            (iii) the member’s party affiliation (if any); 
            (iv) the ward which the member represents (where relevant); 
            (v) any office of the council held by the member; 
            (vi) any committee of the council to which the member belongs; 

    (c) the minutes of the proceedings of the council’s meetings and (in so far as is reasonably practicable) any documents which are referred to in the minutes;

    (d) any audited statement of the council’s accounts.


The 2013 Act also states that:
    "A public notice given by a community council must, in addition to the requirements imposed by subsection (1), be published electronically.”


http://www.legislation.gov.uk/anaw/2013/4/section/55/enacted


http://www.legislation.gov.uk/anaw/2013/4/section/55/enacted

Elected representatives allowances published

posted 29 May 2014, 07:27 by Ian Perry   [ updated 29 May 2014, 07:30 ]

The Vale of Glamorgan Council have published details of elected members' allowances (earnings and expenses) for their roles.

His role as Chair of the Vale Council's Scrutiny Committee, makes St Nicholas Councillor, J. Bird, one of the top earners amongst elected representatives.

Basic salary: £1,593.75
Basic Senior / Civic Salary: £19,259.56
Total: £20,853.31 

From the councils website:
"Scrutiny is a key part of the Council's political structure and plays an important role in ensuring that the Council's services are delivered effectively, efficiently and in the interests of residents and those who work or visit the Vale of Glamorgan.
 
Scrutiny Committees are made up from Councillors who are not on the Cabinet. These Committees are able to influence decisions that are taken by the Cabinet and to ensure that the views and needs of the community are taken into account."

Alun Cairns MP's Deposit LDP representation

posted 14 May 2014, 15:49 by Ian Perry

Alun Cairns made the following representation on the Deposit LDP during the consultation at the end of last year.  Specifically, on st Nicholas he wrote, "Land to the east of St Nicholas — St Nicholas is a minor rural settlement and this proposal for the development for 100 dwellings is a significant increase and doubles the number outlined in the previous LDP. This is not an appropriate scale which is sympathetic to the existing village. Policy SP1 is not achieved through this proposal."




Community Councils Deposit LDP Response

posted 14 May 2014, 05:44 by Ian Perry   [ updated 14 May 2014, 06:44 ]

Tucked away on pages 448 to 459 of Volume 7 of the Deposit LDP Representations is the Community Councils response.  It may look familiar as this is the document that was circulated to residents and submitted numerous times by various residents.

Vale Councillor Jonathan Bird's name does not appear in the Representations Register, so it is possible that he did not make a representation.

St Nicholas


Bonvilston







£25m widening of Five Mile Lane imminent

posted 28 Apr 2014, 12:23 by Ian Perry   [ updated 28 Apr 2014, 12:25 ]

The Welsh Government’s plans to improve the A4226 (Five Mile Lane) between Bonvilston and Cardiff Airport are moving apace with the WG making a recent announcement of its intention to progress the £25 million scheme rapidly. 

In essence, the plans are likely to revolve around the removal of bends and road widening which, it is hoped, will improve the journey time for commuters along with addressing any road safety issues and improved access to the Enterprise Zone at St Athan and Cardiff Airport. When the work is completed, airport and other traffic from the southwest of the Vale traffic will be directed through St Nicholas.

Cameras are to be installed along the route, with the post for two cameras already in place at the bottom of Tumble Hill.  These are likely to be complemented with electronic variable signs - and mobile signs.

Once the work is complete, the conditions of the planning inspector for trunking of the A48 through St. Nicholas, made at the public enquiry, will have been met.  The trunking of the A48 will take place, and the main route to Cardiff Airport and Enterprise Zone from Cardiff and the M4 will pass through St Nicholas.

£3m is currently being spent straightening the road between the airport and St Athan.


Welsh Government responds to Vale of Glamorgan LDP

posted 9 Jan 2014, 06:00 by Ian Perry   [ updated 9 Jan 2014, 12:37 ]

The following letter has been received by the Vale of Glamorgan from the Department for Housing and Regeneration, of the Welsh Government.  There is criticism of the LDP Deposit, including of its "soundness".

The Welsh Government suggests that the number of dwellings proposed in the LDP Deposit is TOO LOW, and that there should have been provision for an additional 500 dwellings in the Vale of Glamorgan.  The welsh Government also appears to want all the land assigned for dwellings in the LDP to be made available immediately.  However, the 'Scale and Location of Growth' is questioned by the Welsh Government, as is the clarity on the use of 'Best and Most Versatile Agricultural Land'

The Welsh Government also, crucially, criticise the scale and size of development in the minor rural communities such as St Nicholas.  The Welsh Government consider that the proposed spatial distribution could potentially encourage reliance on the car and compound infrastructure problems in rural locations.  They state:  "While it is acknowledged that one of the aims of the plan is to support facilities in minor rural villages, it is not clear that the rationale for allocating over 940 units in such areas has been fully evidenced."

On agricultural land, the Welsh Government write:
"The Welsh Government accepts that greenfield land will be required to meet the scale of growth identified over the plan period. However, the Welsh Government considers that the scale of loss is of national significance and should not be disregarded lightly. The Welsh Government considers that the LPA should thoroughly evidence the selection of sites and demonstrate that any loss of BMV agricultural land is minimised, only used when fully justified, as set out in PPW, paragraph 4.10.1. The authority should also explain the rational for allocating new sites in these areas, especially as they were not included in the previous Deposit Plan."

And, the Welsh Government writes:
Allocations in some minor rural settlements, for example, 100 units at St Nicholas and 120 units at Bonvilston appear disproportionate to current services and facilities.


The full letter is as follows:



   

Adran Tai ac Adfywio

Department for Housing and Regeneration



Rob Thomas

Head of Planning & Transportation

Vale of Glamorgan Council

Docks Office Barry Docks Barry

CF63 4RT

                                                                                                                                                                Our Ref:  QA980858

                                                                                                                                                                Your Ref: P/POL/AMW/LDP3

                                                                                                                                                                Date: 20 December 2013

Dear Rob,

 

Vale of Glamorgan Local Development Plan – Revised Deposit LDP

Welsh Government Representation

 

The Welsh  Governmenis  supportive  of  the LDP  strategy,  particularly  maximising  the economic opportunities offered by the St Athan Cardiff Airport Enterprise Zone, illustrating the essential role that the Vale of Glamorgan plays in the success of the wider geographical context. However, we do have concerns regarding delivery of the plan and the scale of growth being insufficient.

 

A critical element for the plan will be the phasing, timing and delivery of sites, ensuring that the plan delivers the scale of growth in locations to meet the needs across the entire plan period. There are numerous allocations which are subject to significant constraints, such as sewerage infrastructure, that would appear to impact on the viability, timing and delivery of key sites. We therefore consider that if such concerns remain unanswered, additional sites will be required to ensure the plan makes sufficient provision to meet the identified need, potentially from alternative sites, candidate sites or those in previous versions of the plan, having been subject to a sustainability appraisal.

 

The implications arising from the economic growth strategy and the relationship to housing provision have not been fully explored. The scale of economic growth sought through the plan would suggest increasing the housing provision. We  are also concerned that the Council’s approach to the phasing of residential allocations is too restrictive, not sufficiently flexible or justified by evidence. It is considered that the phasing policy will compound further housing land supply issues in the Vale.

 

The Welsh Government’s 2011 population projections indicate a potential downward trend in population growth for the Vale of Glamorgan, albeit the official household projections have not yet been formally released. This could result in a housing requirement below the Welsh  Government  2008  household  projection.  However,  it  is  considered  that  such  a

reduction would considerably hinder the plans ability to deliver on the strategy, infrastructure and particularly economic goals. It would be inappropriate to plan to replicate a period of economic decline. The level of housing proposed is not considered sufficient to deal with changing circumstances, particularly if sites were to be delayed. Based on the Council’s evidence we consider there is a shortfall of 500 homes, resulting in raising the housing provision in the plan to approximately 10,950 dwellings over the plan period. The housing  provision in the Deposit Plan should be an absolute minimum aany further reduction would not align with the evidence base and would impact negatively on the soundness of the plan.

 

The current consultation on the Draft Planning Bill makes reference to end dates of development plans, after which it is proposed they no longer remain extant. This would apply to the Vale of Glamorgans Unitary Development Plan (UDP) which expired in 2011. This could result in the authority having no extant development plan in place to make decisions before adoption of the LDP. It is therefore imperative that LDP preparation moves forward as swiftly as possible incurring no further delay. We would wish to avoid a situation where your local authority is in a vulnerable position for an extended period of time.

 

The matter of whether a plan is considered ‘sound’ will be for the appointed Planning Inspector to determine. I have considered the Deposit LDP in accordance with the consistency/coherence tests, and principally in accordance with whether satisfactory regard has been given to national planning policy (test C2). The Welsh Government’s representations are separated into 4 categories which are supported with more detail in the attached annex.

 

Category  A:  Objection  under  soundness  tests  C2,  CE2:  Fundamental issues  that  are considered to present a significant degree of risk for the authority if not addressed prior to submission stage, and may have implications for the plan’s strategy:

 

None.

 

Category B: Objections under soundness tests C2, CE1 & CE2: Matters where it appears that the deposit plan has not satisfactorily translated national policy down to the local level and there may be tensions within the plan, namely:

 

B1.  Scale and Location of Growth Flexibility and spatial strategy

B2.  Deliverability - Phasing, infrastructure, flooding and sewerage capacity

B3.  Gypsy and Traveller Provision

B4.  Employment - Distribution, provision and deliverability

B5.  Minerals

 

Category C: In relation to soundness tests CE2, CE3, CE4: whilst not considered to be fundamental to the soundness of the LDP, we consider there to be a lack of certainty or clarity on the following matters which we consider we can usefully draw to your attention to enable you to consider how they might be better demonstrated:

 

C1.  Affordable Housing - Thresholds, targets, commuted sums and evidence

C2.  Gypsy & Traveller Criteria Based Policy

C3.  Monitoring Framework

C4.  Best and Most Versatile Agricultural Land

 

Category D: Matters relating to clarity of the plan generally which we consider may be of assistance to your authority and to the Inspector in considering suitable changes:


Please refer to annex.

 

It is for your authority to ensure that the LDP is sound when submitted for examination and it will be for the Inspector to determine how the examination proceeds once submitted. You should  consider  how you  could  maximise  the  potential of  your LDP  being  considered ‘sound’ through the examination process. An early meeting is considered advantageous to discuss matters arising from this formal response to your deposit LDP and I would encourage you to contact me to arrange a mutually convenient time.

 

  

Yours sincerely

 

 

 

Candice Coombs

Planning Manager

Planning Division (Plans Branch) Welsh Government




Annex to Welsh Government Letter 20th December 2013 in response to the Vale of Glamorgan Revised Local Development Plan.


Category A - Objection under soundness tests C2, CE2: Fundamental issues that are  considered  to  present  a  significant  degree  of  risk  for  the  authority  if  not addressed prior to submission stage, and may have implications for the plan’s strategy:

 

 

No Issues.

 

 

 

CategoryB- Objections under soundness tests C2, CE1, and CE2: Matters where it appears that the deposit plan has not satisfactorily translated national policy down to the local level and there may be tensions within the plan, namely:

 

B1. Scale and Location of Growth

 

a)     Housing Provision & Methodology - Policy SP3 & MG1

Planning Policy Wales (PPW, paragraph 9.2.2) states that the latest Welsh Government (WG) household projections should form the starting point when assessing the housing requirement for a plan; currently the 2008 based household projections. Using the Council’s own conversion ratio (households to dwellings) of 4.95% this equates to approximately

10,035 dwellings over the plan period 2011-2026.

 

The Deposit plan makes provision for 10,450 dwellings which includes a 5% flexibility allowance, with a housing requirement of 9,950 dwellings set out in Policy MG1. We note that the requirement (Appendix E, Population & Household Projections Paper) incorporates the ONS mid year estimates for 2009 and 2010. We do not disagree with the approach taken. However, we object to Policy SP3 and MG1 on the basis that the level of housing proposed does not include an adequate flexibility allowance.

 

Further clarification is also required to explain the interrelationship between the level of housing provision and the Council’s economic and employment proposals, and the role and function of the Vale of Glamorgan within the wider geographical context. In addition, it is considered that the level of housing provision and phasing policy is not sufficiently flexible to deal with the myriad of constraints on many of the proposed allocations. Further explanation is required as to why the overall level of housing provision has been reduced by 500 homes from the previous Deposit Plan given the strategy and objectives remain the same.

 

b)     Flexibility Allowance - Policy MG1

The LDP should include a flexibility allowance to demonstrate that the plan can respond to economic challenges, unforeseen circumstances associated with delivery. The Welsh Government has indicated that a notional flexibility allowance of 10% may be appropriate to allow for uncertainty regarding the delivery of sites and unforeseen issues. The first Deposit Plan (February 2012) included a 10% flexibility allowance consisting of two ‘reserve sites of 995 dwellings. The flexibility has been reduced to 5% (one reserve site) in this Deposit Plan. The rationale for such a reduction has not been explained or justified given the identified constraints. We object to the 5% flexibility level set out in Policy MG1. The plan should be amended to include a 10% flexibility resulting in an overall housing provision of around 10, 945 dwellings, 490 units more than the current plan provision.


c)     2011 Based Household Projections

Whilst the WG 2011 based population projections have been published, the equivalent household projections have not yet been released. We anticipate those to be available in the  New  Year.  The  Council  will  need  to  explain  both  thimplications  and  the appropriateness of the 2011 household projections, and how the various components, such as migration, relate to the strategy and the issues that the LDP is trying to address.

 

Planning officials consider that the WG 2011 population projections will indicate a potential downward trend in population growth for the Vale of Glamorgan (a planning not statistical assessment). This could result in a housing requirement significantly below (around 2800) units) the WG 2008 household projections. However, it is considered that such a reduction would considerably hinder the plans ability to deliver on the strategy, infrastructure and economic goals. The authority should not plan for declining economic activity. The current housing provision expressed in the Deposit Plan should be an absolute minimum. It is considered that any further reduction will not align with the evidence base and will impact negatively on the soundness of the plan.

 

d)     Spatial Strategy - Policy MG 2

It is unclear how the role and function of settlements has been reflected with regard to the scale  of  housing  proposed.  While the  scoring  matrix  focuses  on  ‘functional  links’ (Sustainable Settlements Appraisal 2013) the services and facilities in many of the minor rural villages themselves appear poor. Allocations in somminor rural settlements, for example, 100 units at St Nicholas and 120 units at Bonvilston appear disproportionate to current services and facilities. The proposed level of housing provision has increased in totality within Minor Rural Villages from 787 units in the first Deposit Plan to 946 units. Further clarification is needed to explain whether provision matches need in the appropriate locations  and  how the  proposed  allocations  align  with  the  objectives  of  the  plan.  For example, scale of growth and commuting patterns.

 

We consider that the proposed spatial distribution could potentially encourage reliance on the car and compound infrastructure problems in rural locations. While it is acknowledged that one of the aims of the plan is to support facilities in minor rural villages, it is not clear that the rationale for allocating over 940 units in such areas has been fully evidenced. The level of housing provision in Barry has reduced significantly from 3052 units from the previous Deposit Plan to 2360 units. The current spatial distribution is potentially in conflict with Key Objectives 2 and 3 of the LDP. It may be necessary to allocate additional housing sites in the Key and Service Centre Settlements.

 

Settlement Hierarchy

Total New Allocations

% split

Key Settlement: Barry

2360

30%

Service Centre

Settlements: Cowbridge, Llantwit Major and Penarth,

1606

21%

Primary Settlements (incl. reserve site)

(Dinas Powys, Lanndough,

Rhoose, St Athan, Sully

Wenvoe)

2917

37%

Minor Rural Settlements

946

12%

Total

7829

 


The rational for not including settlements boundaries at minor rural villages and the relationship to the scale of growth requires further justification. Paragraph 7.29 (and Policy  MD6 Development  within  Minor  Rural  Settlements)  states  that development  will

”generally comprise infilling or limited small scale extensions to the minor rural settlements, in particular where they meet the need for affordable housing”. The policy appears to be in direct contrast with the scale of allocated units within some minor rural villages. Policy MD6 gives criteria for future development but does not restrict numbers. No settlement boundary in these locations could result in additional housing sites in less sustainable locations.

 

e Spatial Strategy – Affordable Housing/Local Housing Market Assessment (LHMA) The LHMA (2010) concludes that the affordable housing need is 915 dwellings per annum, equating to 13,725 over the plan period. We note that this includes the backlog (i.e. existing households in need of accommodation) and an analysis of household type and tenure. The LDP will contribute towards meeting the identified need through the provision of 2694 affordable homes over the plan period (Policy SP4).

 

 

The LHMA (Table 6.13) highlights that the greatest areas of need are Barry, followed by the coastal zone and Penarth. Allocations have changed substantially to that set out in the previous Deposit Plan. For example, Policy MG 2 (Housing Allocations) shows that 2740 units are allocated in Barry and Penarth. However, the level of housing provision within Barry and Penarth has decreased significantly (by 912 units) from the 3652 units that were previously allocated in the first Deposit Plan. The LHMA has not changed between the two Deposit Plans. It is unclear as to what extent the LHMA has informed the spatial distribution  in  this  Deposit  Plan  or  how  the  need  for  affordable  housing  has influenced the number and location of sites in the plan.

 

B2. Deliverability

 

a)     Deliverability: General

We support the aspirations of the strategy to deliver the level of growth and the strategic employment  opportunities.  However,  such  a  dispersed  pattern  of  growth  doepose problems for infrastructure delivery, in particular sewerage infrastructure. The majority of development sites rely on private sector investment and implementation and many are subject to significant development constraints.

 

The Welsh Government is concerned about deliverability as many of the sites are dependent on infrastructure improvements which do not appear to have been costed, the significance of which may have a detrimental impact on the viability sites. This is potentially compounded when viability of development is considered in the round, a restrictive phasing policy and a lack of sufficient flexibility in the housing provision.

 

b) Deliverability and Implementation: Phasing of Allocations - Policy MG

Policy MG1 Housing Supply’ and The Housing Supply Background Paper (2013) state that the Council is proposing to release housing allocations over three successive five year periods, prioritising brownfield allocations and those that deliver key infrastructure. Appendix 4 of the Deposit Plan sets out the proposed phasing for housing allocations as follows:

2011-2016 = 1537 (307pa); 2016-2021 = 3197 (639pa); 2021-2026 = 2595 (519pa). We object to Policy MG1 on the basis that the rational for controlling the phasing of sites in favour of brownfield land is not clearly justified, particularly as the Council has consistently struggled to maintain a five year housing land supply over recent years. (The County has only managed to achieve a five year housing land supply on one occasion in the past five years. Such a deficiency is contrary to national policy.)


 

Joint Housing Land Availability Studies (JHLAS 2012 & 2013) show that completion rates have been slower than anticipated (415 units) leading to a potential shortfall of 200 units. The authority should provide an update on sites with planning permission, sites under construction and housing completions prior to the examination.

 

Attaining higher build rates will only be feasible if the large strategic sites come forward as phased, especially in the early years of the plan. These sites account of 38% of site allocations. If construction is delayed on key sites it is likely to affect the plans ability to deliver the housing requirement. It is vital that the monitoring framework identifies any significant shortfalls and is sufficiently robust to ensure the strategy is delivered. We have concerns regarding the appropriateness of the monitoring indicators.

 

PPW  (paragraph 2.5) advocates that phasing strategies should be flexible to allow for choice and to ensure that housing markets are effective. It states that phasing policies in the plan should only give a broad indication of the timescales for the release of the main development  areaor  identified  sites,  rather  than  an  arbitrary  numerical  limit  on permissions, or a precise order of release of sites in particular periods. On this basis we consider policy MG 1 does not comply with national policy. It would not be appropriate to delay sites that are not constrained or integral to the delivery of key infrastructure in the plan where there is a high level of demand for private and affordable homes. Such an approach would compound the existing problems of housing land supply.

 

Reserve Site (Land West of Swanbridge Road)

We object to the classification of Land West of Swanbridge Road as a reserve site.

The site should be allocated and the timing of its release should not be restricted. The Welsh Government does not consider it appropriate to impede housing provision, as long as it accords with the plan’s strategy and sustainability appraisal, particularly where it will resolve key issues identified in the plan.

 

c)     Deliverability and Implementation - Infrastructure

We note the authority has produced a Draft Infrastructure Plan (September 2013). The aim of this document is to inform the CIL charging schedule and to demonstrate that the LDP is both realistic and deliverable. We note that the Council intends to produce a second phase to this work, which will include detailed feasibility, viability and costing information. Without this detailed work, we consider there is a considerable gap in the evidence which needs to be addressed. The authority need to demonstrate that all allocations and related infrastructure and are financially viable and deliverable within the plan period.

 

d)     Community Infrastructure Levy / Planning Obligations

Deliverability of the plan is inextricably linked to infrastructure delivery. We note the Council has commenced work of a CIL schedule which will be subject to independent examination prior to adoption of the plan. Clarity on the implications for development arising from an inability to ‘pool future S106 agreements after 6th April 2015 should be carefully considered. As per the timescales set out in the current Delivery Agreement, and subject to the outcome of the examination, the Council will not be in a position to adopt a CIL charge until 2017.

 

Annex 1 of Draft Infrastructure Plan notes the infrastructure that is likely to be required through CIL. Appendix 2 sets out schemes that will be required through a CIL. The Council should be certain that without a CIL charge in place, the required infrastructure is not beyond the tests set out in the CIL Regulations (R122) and delivery of sites and key infrastructure in the plan will not be inhibited.


Policy MD4 – Community Infrastructure and Planning Obligations

Policy MD4 includes an expansive list of various planning obligations that may be sought from development through S106 agreements or CIL. The interrelationship between Policy MD4 and the Draft Infrastructure Plan is unclear. Where funding for related infrastructure is to be sought through planning obligations, the plan should specify the Council’s priorities to inform the provision of infrastructure/mitigation and avoid development being unviable. This will also give clarity to applicants and developers.

 

e)     Flood Risk

Paragraph 3.2.8 of the background paper Plan Preparation & Assessment of Flood Risk’ (2013) states that four sites (which incorporate zone C2 land) have been included only where the Council is satisfied that built development would be sited outside of such zones, and/or the impacts of flooding would be able to be ‘acceptably managed’. The following allocated sites are for residential and highly vulnerable uses are partly located in the Zone C2 flood plain.

 

·    MG2 (5) Land to the East of Eglwys Brewis, St Athan (250 units)

·    MG2 (7) Land Between new Northern Access Road and Eglwys Brewis (375 units

·    Land at Hayes Road Sully (Gypsy and Traveller Allocation) 18 Pitches

 

The authority should provide clear evidence of how flooding policy has been considered in the site selection process. PPW (Section 13.3) and TAN 15: ‘Development and Flood Risk’ clearly states that highly vulnerable development (including residential and gypsy and traveller sites) and emergency services  should not be allocated within Zone C2, regardless of a FCA. The Welsh Government issued revised Development Advice Maps (DAMs) in March 2013. It is imperative that the authority confirms that the latest DAM maps have informed the site selection in the Revised Deposit Plan.

 

f)      Sewerage / Drainage Capacity

The Draft Infrastructure Plan does not explain in sufficient detail how sewerage/drainage infrastructure will be delivered over the plan period. Appendix 5 of the LDP lists at least 28 housing allocations sites (including key sites) that have some or significant sewerage or water capacity issues requiring further modelling/consultation to determine what infrastructure improvements are required.

 

The authority should explain the scale of sites affected and the timing of how current constraints will be resolved.

 

B3. Gypsy and Travellers

 

a)     Gypsy and Traveller Provision

Local authorities have a statutory duty under sections 225 & 226 of the Housing Act 2004 to consider the needs of Gypsies & Travellers, resulting in the identification of suitable sites in the LDP to meet identified unmet need (paragraph 17, Welsh Government Circular 30/2007 ‘Planning for Gypsy and Traveller Caravan Sites’). The LDP should make provision to

meet the identified need over the plan period to 2026 which currently is unclear.

 

The evidence base is also unclear as to what and who the 18 pitch requirement relates to: Gypsies, New Travellers and/or Travelling Show people. The evidence base should be clarified further to explain both the need and resulting pitch requirement as relates to the appropriate definition in WAG Circular 30/2007.


b)      (Policy MG 5 Land at Hayes Road Sully) - Suitability of Site

The site is partly situated in zone C2 flood plain. Evidence will be necessary to demonstrate that appropriate infrastructure to enable access and egress would be unaffected by the C2 designation. The Welsh Government considers that the plan should demonstrate that the area has sufficient capacity to accommodate the stated use and scale to avoid conflict with regard to flood risk.

 

Appendix 2 of the Draft Infrastructure Plan states that delivery of the site is in part reliant on the funding from Welsh Government. The authority should clarify to what extent the deliverability of these sites is reliant on Welsh Government funding and in the absence of such funding, what are the implications for deliverability.

 

c)     Transit Provision

The authority has not made provision for a transit site in the LDP, and suggests that this should be dealt with at a regional level. The GTAA suggests there is a gap in provision of around 10 pitches close to the M4. The plan should make provision for identified need, where the evidence indicates there is a need. Publication of the Consultation Paper and Draft Planning Bill may provide a statutory plan based approach to resolve this matter. The Welsh Government considers that a more strategic approach to land use planning, as highlighted through the Independent Advisory (IAG) Report, would resolve transit site matters along the M4 corridor in the medium to long term.


B4. Policy SP5: Employment Requirements / MG 9 Employment Allocations a)     Strategic Employment Land Provision

Policy MG9 allocates 433.5ha at strategic employment sites to deliver 12,000-15,000 jobs in the key sectors; aerospace, high tech manufacturing, logistics and distribution. The aim of the strategic employment allocations is to support and provide a catalyst for new employment in the wider capital region. Such an approach is supported. However, it is unclear how this significant uplift in job growth relates to the level of housing provision in the plan. For example, how do the assumptions regarding base population, migration,  and  the  working  age  profile  relate  to  this  increase  in  job  growth  and  key objectives of the plan such as reducing out commuting?

 

Such a high level of employment growth may indicate that the population (working age profile) will need to increase and additional homes will be necessary to enable people to live in close proximity, delivering on the key objectives. Given the scale of employment at St Athan & Cardiff Enterprise Zone the authority should consider allocating additional homes in line with the strategy to enable more sustainable communities and reduce current levels of out-commuting. (See response B1.a)

 

There is a lack of evidence to explain the strategic employment allocation totalling 34.9ha (net) at Hensol (Policy MG 9.1 & MG 9.11). This settlement is not identified in the hierarchy and the evidence base concludes ‘it is not clear what demand exists’ for the allocation.

 

b)     Local Employment Land Provision

The Council has based their local employment supply on historic take-up rates for the period 2007-2011 (2.65ha per annum). Policy MG9 allocates 53ha of local employment land up to 2026 (with the inclusion of a 5-year buffer). We note that a longer period (1996-2007) would indicate a higher rate of 4.1ha per annum. Further clarification is required to explain that by projecting forward employment take up rates from a period of economic decline this will not adversely impact on the delivery on the economic objectives of the plan.


c)     Spatial Distribution of Employment

Whilst it is difficult to demonstrate a direct and precise relationship between the level of housing and employment provision in a plan, it appears that there is limited employment provision in the key and service centre settlements.

 

The strategy aims to match existing and planned housing developments with new employment opportunities. However, there appears to be a misalignment with employment provision in relation to the settlement hierarchy. It is unclear why there are no employment allocations in the Service Centre Settlements to coincide with the proposed housing allocations. The Key Settlement of Barry and the wider South East Zone has been identified in the plan as having a significant residential population that will act as a focal point for growth over the plan period. Despite the high population density, just 7% of all employment allocations have been identified here to meet local need. Additional employment sites in the South East Zone to meet local expansion and investment may be required.

 

d)     Deliverability of Employment Sites

Several employment allocations have significant constraints (Appendix 6, Deposit Plan). Constraints appear likely to affect the timing, viability and developable area of allocations, albeit some sites appear to be at a greater risk than others.

 

Based on the Council’s evidence we have concerns regarding the deliverability of local employment allocations, many of which have been carried forward from the adopted Unitary Development Plan (UDP). For example, the employment site of Ffordd y Mileniwm, Barry (MG 9.5) is subject to flood risk, has no current sewage provision, contains archaeological resources  anland  value issues.  This raises  questions  on  deliverability and  timing  of release. Such constraints could reduce the net developable area and the authority should update Policy MG 9, total (net) local employment to account for this.

 

Further issues that exasperate deliverability are the estimated availability of local employment sites. Just 9% (approximately 2ha) of allocations will be available and serviced during the period 2014-2018; after this period many of the available sites will still not be served by utilities and road access. Table 32 of the Employment Land Study identifies that Barry will have little immediate supply, with 25.6ha unavailable for at least another 5 years. This limits the choice and flexibility to meet local demand.

 

It is vital that the monitoring framework identifies any shortfalls in delivering the level of employment in the plan period, including appropriate triggers that will inform how these issues will be addressed to maximise economic opportunities.

 

B5. Minerals

 

a)     Housing allocations in minerals safeguarding areas

Further evidence is needed to support the rationale for allocating several housing and employment sites within Category 1 safeguarding areas which contain resources of national (UK and Wales) importance and Category 2 safeguarding areas. The Minerals Planning Background Paper (paragraph 4.27) states that the allocation will take precedence over the safeguarding  requirement  as  the  Council  has  considered  thimpact  on  the  resource. Criteria  (ito (v)  provide  a  justification  fothe  allocation  of  siteaffected  by  minerals safeguarding. However, the authority needs to demonstrate how the criteria have been applied to the assessment of sites in order to show how the allocations are acceptable and relative to the protection of the resource.


b)     Policy SP9 Minerals

Clarity is required on how the land bank and Regional Technical Statement (RTS) requirements are being satisfied. The reasoned justification for Policy SP9 states that the assessment of the land bank has been based on MTAN 1: ‘Aggregatesand the RTS 2008 requirements. The RTS 2008 suggests that whilst the Vale of Glamorgan did not have to make further provision, the situation should be kept under review as most of the reserves are in Bridgend. The Minerals background paper states that the RTS 2008 figures are high and that sufficient resources exist, such that there is no requirement to share reserves with Bridgend. However, it does recognise that the situation is economically depressed and monitoring is required. Clarity is required as to how reserves at Forest Wood Quarry have been counted as part of the land bank calculation and how this reserve has been ‘shared’ with Rhondda Cynon Taf.

 

c)     Draft Regional Technical Statement (RTS) First Review

Table 5.3 of the draft First RTS Review shows that the Vale of Glamorgan has a shortfall of 13.55 million tonnes of crushed rock aggregates over the period 2011 to 2036. Whilst we acknowledge this document is in a draft form and the assessment is not strictly in accordance with MTAN 1: ‘Aggregates’, it would be prudent for the authority to demonstrate that the apportionment requirements over the LDP period can be satisfied. A criteria based approach is only likely to be appropriate where no future allocations are necessary over the plan period. It may be that the requirements indicated in the draft First RTS Review can be accounted for, but clarity would be beneficial given the Vale of Glamorgan’s importance as a production area for limestone.

 

d)     Policy MG20 - Development in Minerals Safeguarding Areas

Clarification on the application of the criteria would be beneficial. Are the criteria stand alone or should they be read in conjunction? For example, the application of criterion 4 relative to criterion 3 is unclear. If geological evidence on the quality and quantity of the resource shows it to be geologically poor and limited in extent, then it is not clear what value the application of criterion 4 would add. Criterion 4 could apply as a stand alone test.

 

Criterion 1 suggests that development should not proceed unless prior extraction occurred. This is undermined by the reasoned justification (paragraph 6.128) which suggests that market demand will be a factor in defining whether prior extraction is feasible. To be in accordance with national policy the reason for the safeguarded area and the long term benefit of the resource should be considered relative to the need for development and any short term economic arguments.

 

e)     Policy MG23 Mineral Working

The  supporting  text (paragraph  6.138)  states  that “priority  will  be  given  to  the  usof recycled material and secondary aggregates before new sources of primary materials are developed. To aid clarity this should be included as a criterion in the policy if it is to be applied successfully.

 

 

Category C - In relation to soundness tests CE2, CE3, CE4: whilst not considered to be fundamental to the soundness of the LDP, there is considered to be a lack of certainty or clarity on the following matters which can usefully be drawn to your attention to enable you to consider how they might be addressed:

 

C1. Affordable Housing - Target, thresholds and commuted sums 

a)     Affordable Housing: Thresholds


We support lower thresholds and the use of commuted sums where the evidence indicates it is financially viable, particularly as affordable housing is considered to be a key issue for the plan to maximise delivery. This point is further reinforced by the proportion of small sites that could be captured under Policy MG4.

 

However, the conclusions of the report are not reflected in the policy. The report recommends that the Council should adopt a 10 unit threshold in Barry and Penarth. This reflects that brownfield sites in Barry and Penarth are generally more constrained. Whilst challenging, targets needs to be grounded in evidence and applicable to the majority of applications, whilst allowing site specific negotiations to occur, if/where necessary (on a limited number of sites). The authority should explain how the 5 unit threshold that is contrary to the report findings will not prejudice the delivery of sites in Barry and Penarth.

 

b)     Affordable Housing: Commuted Sums

The policy position in respect of commuted sums is confusing. The reasoned justification (paragraph 6.28) explains that contributions in Barry, Llantwit, Rhoose and St Athan will provide an on site contribution of affordable housing. The position for other areas is unclear. Paragraph 6.30 states that new residential developments (within Cowbridge, Penarth, Dinas Powys, Wenvoe, Minor Rural and the Rural Vale) involving a net gain of 1-2 units will require a commuted sum. Paragraph 6.31 states that while the Council’s preference is for on-site provision, the council may allow affordable housing to be delivered off site via a commuted sum. Does this apply to all areas? In addition paragraph 6.33 of the plan states that for sites of 3 or more dwellings, on site provision will be sought. This requirement is omitted from the policy.

 

Reference to commuted sums and as to what thresholds they apply to should be included in the policy and made more explicit in the supporting text. This will aid the clarity of the plan and give certainty to developers.

 

c)     Affordable Housing: Target

The word “minimum” in the policy is inappropriate as there may be cases where a lower figure is all that can be achieved, based on viability and site specific considerations. The policy should include a reference to facilitate viability discussions, as is the case with other local  authority  plans/policies  in  those instances  where  the  set  level  sought  cannot  be achieved  due  to viability  matters.  This  will  then  allow  viability  evidence  to  influence a different outcome, based on evidence, not inhibiting development from coming forward.

 

d)     Affordable Housing: Viability Work / Ministerial Statement (July 2013)

The Council should update the financial viability work to take into account the implications of the recent Ministerial Statement (July 2013) which makes it clear that Part L will have a close to cost neutral effect on building costs. Based upon the domestic fire safety requirements costs outlined in the Consultation Regulatory Impact Assessment, equate on average to £3,100 per domestic property (Previous examinations assumed £7,300).

 

The Council’s delivery agreement states adoption of the plan in January 2017. At the time of the examination the overarching viability study will be five years out of date. It will be important for the Council to monitor any significant change to requirements which could have a consequential impact on viability.  The authority should consider providing an update to the viability evidence prior to examination, as has been the case in the other authorities.


C2. MD 18 Gypsy & Traveller Accommodation Criteria Based Policy

Welsh Government  Circular  30/2007  ‘Planning  for  Gypsy  and  Traveller  Caravan  Sites’ requires criteria based policies to be fair, reasonable, realistic and effective in delivering sites, and that policies should not rule out or place undue constraints on the development of sites (paragraph 25). The following criteria of Policy MD18 appear overly restrictive:

 

·    Criterion 1 Gypsy and Travellers should be treated the same as others. It is not reasonable that an application for a new site would be refused if residents could be accommodated on another site. This is not in line with national policy.

·    Criterion 2 Is not in line with the freedom of choice to make individual private Gypsy and Caravan site provision (Circular, paragraph 5). Sites may be on the outskirts of built up areas as well as in rural & semi rural settings (Circular, paragraph 26).

      ·    Criterion 3 Could be expressed more positively (Circular, paragraph 26)

·    Criteria 4 For private Gypsy and Travellers the caravan site licensing system (and related model standards) deal with public health on site services and arrangements.

      ·    Criteria 5 The phrase “adequacy of the existing highway network to serve the site” may go beyond the guidance          with the Circular (Para 21 and Annex B, Para 4).

 

C3. Monitoring Framework (Chapter 9)

Mechanisms for implementation and monitoring need to be sufficiently clear and sensitive to provide an early alert to avoid non-delivery. The Monitoring Framework needs to be clear and sensitive to ensure the plan is delivered. A transparent and comprehensive monitoring framework should be an integral part of an LDP. Currently, the LDP monitoring framework has shortcomings regarding trigger points and unspecified actions to redress matters. We object to the following assessment trigger (2021) for the following topic areas:

 

·    PT2,  PT19,  PT20,  PT22,  PT  23  -  Housing,  affordable  housing  and  gypsy  and traveller site related indicators

·    PT3, PT24, PT25 Employment related indicators

 

The assessment trigger point of 2021 (phase three of the plan) for many of the indicators is not appropriate. To ensure delivery of the plan and compliance with national policy shorter timescales should be included to ensure that a review could be triggered if sites are not coming forward as anticipated in time to rectify the problem.

 

·   The affordable housing monitoring should include an indicator relating to affordable housing thresholds in the plan.

·   The LPA should consider the merits of expanding on the list of key housing sites, infrastructure, and employment schemes that are required to deliver the strategy. This could aid the delivery of the key sites and infrastructure within the plan.

 

Employment - Monitoring Framework

The Council does not formally record employment land take-up (Employment Land Study, paragraph 8.5). The authority should explain how the land bank is updated by evidencing supply and identifying areas of demand.

 

·    Employment land monitoring: PT3 and duplicated in PT25 (part). The assessment trigger should be reduced from 10% to 5% reduction in the target of 26.5ha of local employment land developed by 2021.

·    Strategic employment site monitoring: PT24. Trigger weak and requires amendment to quantify the scale of employment land to be developed in the Enterprise Zone by 2021.  Unclear  why  the  Strategic  Site  at  J34  M4 has  been  omitted  from  the

monitoring.


·    St Athan Enterprise Zone: PT34. As the Northern Access Road is significant to the delivery of the site, there should be an additional trigger (inline with the master plan in 2018) to ensure construction commences by 2020.

·    An  additional  indicator  should  be  included  to  monitor  the  supply/demand  of employment sites in Cowbridge. If a shortage of premises/sites is evidenced the Local Authority need to identify a viable location.

 

C4. Best and Most Versatile (BMV) Agricultural Land

The quality of agricultural land has been highlighted in the plan as a potential constraint to development (75 hectares, 1,800 units). This includes four strategic housing sites, one site in a primary settlement and five allocations are in the minor rural villages. Some of the sites have either increased in capacity or are new additions to the revised Deposit Plan.

 

The Welsh Government accepts that greenfield land will be required to meet the scale of growth identified over the plan period. However, the Welsh Government considers that the scale of loss is of national significance and should not be disregarded lightly. The Welsh Government considers that the LPA should thoroughly evidence the selection of sites and demonstrate that any loss of BMV agricultural land is minimised, only used when fully justified, as set out in PPW, paragraph 4.10.1. The authority should also explain the rational for allocating new sites in these areas, especially as they were not included in the previous Deposit Plan.

 

 

 

Category D -  matters relating to clarity of the plan generally which may be of assistance to your authority and to the Inspector in considering suitable changes.

 

Policy MD 15 New Employment Proposals

Paragraph 7.71 - Clarify why applicants may need to consider alternative employment sites outside the plan area and the scale and nature of the proposal that could warrant this.

 

Policy MD 16 Protection of Employment Land and Premises

LPA should identify key employment sites for protection on the Proposals Map. Last sentence of policy needs to be re-written for clarity. It appears contrary to the need to safeguard employment sites and it’s unclear how the Council will seek ‘the provision of equivalent on-site employment uses and/or premises’ for the ‘other use’.

 

Flooding: Site MG32 Llandough Landings

Site falls within Zone C1 and needs to be justified in accordance with TAN15 (Para 10.5).

 

Renewable Energy (Policy MD 19 Low Carbon and Renewable Energy Generation/ Background Paper

Further consideration needs to be given to locations identified in the Energy Study and Assessment documents as potentially viable areas or sites for different renewable energy technologies. It is recommended that these areas be incorporated on the proposals map.

 

Renewable energy targets

The Renewable Energy Assessment identifies increases by 2020 in the percentage of the Vale of Glamorgan’s electricity and heat met by renewable energy sources. Objective 2 could benefit from further clarification in relation to the background evidence.

 

Policy MD10 Promoting Biodiversity Page

Remove where possible” from the policy to reflect its aim.

Planning Application Progress on Land to the East of St Nicholas

posted 4 Jan 2014, 08:09 by Ian Perry   [ updated 4 Jan 2014, 08:49 ]

A formal request for a "screening opinion" as to whether an Environmental Impact Assessment is required, has been made to the Vale of Glamorgan Council for the 4.4 hectares of land to the east of St Nicholas.  The land, put forward as a candidate site by the landowners and the Vale Council in the LDP Deposit  is grade 2 agricultural land, currently used for farming.  This application appears to include access from Ger-Y-Llan that was not included in the LDP.  In recent weeks, a survey has been conducted on the land a the end of Ger-Y-Llan to measure the feasibility of access to the proposed development from Ger-Y-Llan.

The Vale of Glamorgan Council has no LDP, and does not have the required 5-years supply of land required by law for developers.  As a result, developers may put in planning applications on any land they can get hold of.  The LDP deposit that was consulted upon at the end of 2013, will probably  not become a full LDP until 2017 -  and until such time, it's policies and constraints are not enforceable.

The Welsh Government Spatial Plan is the planing document that has been approved and that guides planning in the Vale of Glamorgan. the LDP, when finally approved, has to reflect the policies of the Wales Spatial Plan.


The following letter has been received by the Vale of Glamorgan Council:

LAND TO THE EAST OF ST. NICHOLAS 

I am writing to you on behalf of the land owners who are keen to prepare and submit an outline application for the residential development of the above site which is allocated for housing in the Deposit LDP under policy MG2 (43). The purpose of this letter is to request a screening opinion as to whether an Environmental Impact Assessment is required. In accordance with paragraph 55 of Welsh Office Circular 11/99 1 enclose a plan indicating the proposed location of the development and set out below a brief description of the proposals and its possible environmental effects. 

The site covers an area of 4.4 hectares and is located to the east of the village of St. Nicholas. Access would be obtained via Ger-Y-Llan ensuring that the site integrates well with the existing village. The western and the majority of the southern boundaries of the site are adjacent to existing properties and with the remainder of the southern boundary adjacent to the A48. The eastern and north-western boundaries adjacent to open countryside. The site is currently in agricultural use and consists of mainly open fields with some hedgerows dividing field parcels. 


Initial investigations have been carried out in relation to landscape, ecology, archaeology, which conclude that there would not be any major environmental effects. It is therefore anticipated that the development of the site would have limited environmental impact but there would be a requirement to undertake updated and further reports on transport, archaeology, ecology, landscape, agricultural land quality, to accompany the outline planning applications. 


As the site is in excess of 0.5 hectares it falls within Schedule 2 of the ER regulations. 


Paragraph 32 of Welsh Office Circular 11/99 states that when considering whether an EIA is required for Schedule 2 Development, the basic question to be asked is “Would this particular development be likely to have a significant effect on the environment?” We consider that the proposed development at St. Nicholas does not represent EIA development because: 

(a) The proposed development is not of greater and local significance; 

(b) The site is not particularly environmentally sensitive or vulnerable location; 

 (c) The 
proposed development is not unusually complex with potentially hazardous environmental effect. 


I should therefore be grateful if you would provide me with a screening opinion on whether an EIA is required for the proposed development of the land to the east of St. Nicholas.